Railway Dog Spikes - Cross-Standard Model Comparison & Matching Track Components
|
Standard |
Model Code |
Shank Type |
Key Dimensions (mm) |
Matching Rail Fastener |
Compatible Sleeper Material |
Installation Depth (mm) |
Service Life (Years) |
|
GB/T 152-2019 (China) |
DS-G20×160 |
Smooth Shank |
Shank Diameter:20; Length:160; Head Height:18 |
E-Type Clip System |
Wooden/Composite Sleepers |
120–130 |
8–12 |
|
AREMA (USA) |
DS-A22×180 |
Ribbed Shank |
Shank Diameter:22; Length:180; Head Height:20 |
Pandrol Fastclip System |
Concrete Sleepers |
140–150 |
10–15 |
|
BS EN 13481-4 (EU) |
DS-E18×140 |
Threaded Shank |
Shank Diameter:18; Length:140; Head Height:16 |
SKL Clip System |
Anti-Corrosion Wooden Sleepers |
110–120 |
9–13 |
|
JIS E 2015 (Japan) |
DS-J19×150 |
Knurled Shank |
Shank Diameter:19; Length:150; Head Height:17 |
Nabla Clip System |
Concrete/Wooden Sleepers |
125–135 |
8–14 |
|
UIC 864-2 (Int'l) |
DS-U21×170 |
Hexagonal Shank |
Shank Diameter:21; Length:170; Head Height:19 |
Vossloh Fastener System |
Composite Sleepers |
135–145 |
11–16 |
Railway Dog Spikes - Environmental Impact & Performance Solutions
|
Operating Environment |
Corrosion Risk Level |
Key Performance Challenges |
Recommended Material & Surface Treatment |
Reinforcement Measures |
Inspection Frequency |
|
Coastal Railway (High Humidity/Salt) |
High |
1. Rapid coating degradation; 2. Shank rust-induced loosening |
20MnTiB Steel + Zinc-Aluminum Coating (20–25μm) |
1. Add anti-corrosion washer; 2. Apply anti-rust grease at shank-sleeper interface |
Monthly (first 6 months); Quarterly (after 6 months) |
|
Desert Railway (High Temperature/Sand) |
Medium |
1. Coating abrasion by sand; 2. Material softening at high temp |
45# Steel + Epoxy Powder Coating (60–80μm) |
1. Use sand-proof sleeve; 2. Select high-temperature-resistant material |
Bi-monthly |
|
Mountain Railway (Low Temperature/Frost) |
Medium-Low |
1. Material brittleness at low temp; 2. Frost heave-induced sleeper crack |
Q345 Steel + Hot-Dip Galvanizing (≥85μm) |
1. Pre-heat spikes before installation (-10℃ below); 2. Use frost-resistant sleeper |
Quarterly |
|
Mining Railway (Acid Gas/Dust) |
High |
1. Acid corrosion on shank; 2. Dust accumulation-induced poor contact |
316 Stainless Steel + Passivation Treatment |
1. Install acid-proof cover; 2. Regular dust removal |
Weekly (acid gas area); Bi-weekly (dust area) |
|
Urban Metro (High Vibration) |
Medium |
1. Vibration-induced loosening; 2. Fatigue fracture at head-shank junction |
60Si2Mn Steel + Dacromet Coating (15–20μm) |
1. Increase installation torque by 10%; 2. Add anti-vibration washer |
Monthly |
gnee-professional supplier


Hot Tags: fastening system rail dog spike, China fastening system rail dog spike manufacturers, suppliers, factory, economical rail spikes, large scale rail spikes production, rail spikes manufacturing process, railroad spikes factory, railway spikes production, simple install rail spikes












