22kg Light Steel Rail For Park Train

22kg Light Steel Rail For Park Train

22kg rail steel is a common railway track material. Its main features are light weight, excellent wear resistance, deformation resistance and stability. Light rail is mainly used for laying temporary transportation lines and light locomotive lines in forest areas, mining areas, factories and construction sites.
Send Inquiry
Chat Now
Description
Technical Parameters

 

 

 

Products Description

 

 

22kg light rail is mainly used for laying temporary transportation lines and light locomotive lines in forest areas, mining areas, factories and construction sites. Rails (rails) with a weight of less than 30kg per meter are called light rails.

 

The dimensions of 22kg/m light rail are:

light rail height 93mm, light rail bottom width 93mm, light rail head width 50.8mm, waist thickness 10.72mm,

 

22kg rails are 22kg per meter. This type of rail is generally used for small lifting equipment in factories, and also for light rails for transporting light cargo carts. This type of 22kg/m small rail has a wide range of uses and can be used in industrial and agricultural production. It can also be used in animal husbandry production, such as for the rails of carts used to transport feed; this type of rail can also be used for small trains that transport tourists in parks.

 

 

Parameters Of 22kg Light Rail
type weight (kg/m) material length (m)
22Kg 22.30 Q235/55Q 6-10m
rail height (mm) bottom width (mm) head width (mm) web thinkness (mm)
93.66 93.66 50.8 10.72

 

22kg Light Steel Rail for Park Train

 

22kg Light Steel Rail for Park Train22kg Light Steel Rail for Park Train

22kg Light Steel Rail for Park Train

 

 

 

About Us

 

GNEE (Tianjin) Multinational Trade Co., Ltd.
 

In 2008, our Rail Foreign Trade Company established a firm foothold in the market with firm belief and unremitting efforts. The support of 8,000+ customers is our most valuable asset, and the business scope of 160+ countries is the witness of our continuous growth. Today, 200+ employees are writing a new glory together with the spirit of unity and cooperation.

 

22kg Light Steel Rail for Park Train

 

 

 

FAQ

 

 

1.How long is the production cycle of rails? ​

 

The production cycle of ordinary rails may be around 1-2 weeks. However, for special specifications, special materials or large orders, the production cycle may be extended to 3-4 weeks or even longer.

 

2.Where does the market demand for rails mainly come from? ​

 

It mainly comes from the railway construction field, including the construction of national railway trunk lines, high-speed railways, urban rail transit (subways, light rails, etc.) and local railways, and the renovation and upgrading of existing lines. In addition, the construction and maintenance of railway transportation lines within enterprises such as mines and ports also have a certain demand for rails.

 

3.What are the main logistics links involved in rail trade? ​

 

The main logistics links include inland transportation from manufacturers to ports or warehouses, loading and unloading, warehousing and customs declaration of goods at ports; transporting rails to ports or inland stations in the destination country by sea, land or rail-sea combined transport; and finally delivering rails to the customer's designated location by inland transportation.

 

 

22kg Light Steel Rail for Park Train

22kg Light Steel Rail for Park Train

 

 

Hot Tags: 22kg light steel rail for park train, China 22kg light steel rail for park train manufacturers, suppliers, factory, rails for quality control, rails for noise reduction, 115 re rail dimensions, rails for escape routes, rails for subway trains, used rail track