Products Description
In the field of rail transit engineering, 38kg heavy-duty steel rails play an important role as a key transportation material. The main application scenarios of using raw materials for this GB38kg heavy-duty rail can be divided into the following aspects: in the construction process of railway infrastructure, engineering personnel use specialized fasteners to accurately position the heavy-duty track on the roadbed structure. The 38kg heavy-duty track can significantly improve the geometric stability and operational reliability of the track system.
Secondly, optimizing the anchoring process during the assembly of track components can effectively achieve a reasonable distribution of wheel rail contact stress. This load dispersion effect can not only reduce local stress concentration in railway track transportation, but also delay the wear process of heavy-duty railway track structures.
| Parameters of 38kg Heavy Rail | |||
| type | weight (kg/m) | material | length (m) |
| 38kg | 38.733 | 50Mn/U71Mn | 12/12.5m |
| rail height (mm) | bottom width (mm) | head width (mm) | web thinkness (mm) |
| 134 | 114 | 68 | 13 |
Heavy Steel Rail
| Heavy Steel Rail | Size | Rail Height | Bottom Width | Head Width | Web Thickness | Weightkg/m |
| 38kg | 134 | 114 | 68 | 13 | 38.733 | |
| 43kg | 140 | 114 | 70 | 14.5 | 44.653 | |
| 50kg | 152 | 132 | 70 | 15.5 | 51.514 | |
| 60kg | 176 | 150 | 73 | 16.5 | 60.8 | |
| 75kg | 192 | 150 | 75 | 20 | 74.64 |
38KG Heavy Steel Rail

GB Steel Rails

How to maintain steel rails
Regular inspection: Regularly inspect railway tracks, including normal heavy-duty track shapes for obvious damage or cracks. The inspection period is usually conducted once a year or periodically.
Cleaning and weeding: Keep the railway around the rails clean, promptly remove debris and stones attached to the railway tracks, and prevent weed growth on the roadbed.
38KG Heavy Steel Rail


About Us
Our company attaches great importance to the quality management of every batch of steel rail products and has established a strict steel rail quality control system. We introduce advanced heavy-duty rail inspection equipment and technology to conduct strict quality inspections on rail products. Each batch of products must undergo strict sampling and testing before leaving the factory to ensure that the steel rails meet relevant standards and requirements.
Exhibition


GB 38KG Heavy Steel Rail

FAQ
Q: When can the shipment be made?
A: About 7-14 days, we will definitely ship as soon as possible.
Q: What if there is a problem with the product?
A: We have a comprehensive after-sales service policy, such as technical support, return and exchange policies.
Q: What payment methods are supported?
A: Common payment methods in foreign trade transactions include letter of credit, telegraphic transfer, collection and so on. Specific payment methods need to be determined in consultation with the supplier.
Hot Tags: 38kg heavy steel rail, China 38kg heavy steel rail manufacturers, suppliers, factory, elastic rail clips, 136 re rail profile, railroad spike material, plastic railway sleeper material, square head screw spike, type IV rail fastening system component










