S49 Rail Manufacturing Process

Jan 23, 2024 Leave a message

S49 Rail Manufacturing Process

The manufacturing of S49 rail from GNEE rail factory involves several essential steps to ensure quality and compliance with standards. It begins with selecting high-quality materials like R900A/R1100. The process includes shaping, heat treatment to achieve the required hardness (R260, R320), and grading to meet standards such as 900A/1100. The rail is carefully manufactured to meet the designated weight of 49.39 kg/m, producing a strong and well-built S49 rail ready for use in railway systems.

 

S49 Rail Manufacturer

As a leading manufacturer of steel rails, we produce high-quality railway tracks that meet international standards such as EN, AREMA, AS, etc.  GNEE rail offers 49E1 (S49) steel rails and various other types of rails, and we can customize to meet specific customer requirements. Feel free to send us your drawings for customization. We can tailor our production to meet your specific requirements.

steel rail workshop