The J2 Rail Clip Fastening System is designed to secure steel rails on concrete sleepers, maintaining stable rail positioning, track gauge, and reliable fastening performance during railway operation. The system is mainly used for light rail transit (LRT) applications and is suitable for both ballasted and ballastless track structures. It is installed through embedded insert bolts in concrete sleepers and provides mechanical rail restraint with reduced vibration during train movement.
Main Components of J2 railway clip fastening:

| Main Components | Quantity |
| Rail Clip with high carbon steel | 2 |
| Insert bolt | 2 |
| Plastic guide plate | 2 |
| Flat washer | 2 |
| Hex nut | 2 |
| Rail pad | 1 |
Technical Parameters of J2 Rail Clip Fastening:
| Technical Parameter | Value |
|---|---|
| Clamping force | ≥7KN |
| Anti pulling-out force | ≥80KN |
| Axle load | ≤ 18tons |
| Running speed | ≤70km/h |
| Height adjustment | 0~10mm |
Request a Quote for J2 Rail Clip Fastening
GNEE RAIL provides J2 Rail Clip Fastening System components for railway track projects. The system includes rail clips, guide plates, insert bolts, and related fastening parts designed for installation on concrete sleepers. Components are manufactured using specified materials, such as high-carbon steel clips and polymer guide plates, with dimensional inspection and mechanical testing carried out during production. Material test certificates and inspection documents can be provided according to project requirements. The J2 fastening system has been applied in railway projects.
Hot Tags: j2 rail clip fastening, China j2 rail clip fastening manufacturers, suppliers, factory, High Speed Type V Fastening System, KPO rail fastening system components, railway embankment stabilization with rail fastening, service life of rail fastening, type IV rail fastening system component, what is WJ 8 rail fastening system







