Installation method of gantry crane rail

Apr 23, 2025 Leave a message

 

 

Installation method of gantry crane rail

 

The installation of crane rails should pay special attention to the installation of crane rails, because there is a concrete foundation under the rails, so the installation quality of the rails directly affects the operation of the crane. The rail installation should fully consider the site use environment geology and its bearing capacity, and the track should have a good grounding wire to ensure safe use of electricity. The general installation method of double-beam gantry crane rails is as follows:

 

(1) The joint seam of the crane rail is usually 1 to 2 mm. In cold areas or when the installation temperature is lower than the annual use temperature difference of more than 20 degrees Celsius, the temperature compensation gap should be considered, and four to six mm is appropriate. The rail joint can be straight or made into a 145 degree angle bevel. The bevel joint allows the wheels to transition smoothly at the joint.

 

(2) The top of the crane rail is raised and the bottom is flat with a width, thereby increasing the contact surface with the foundation. This section of the road is H-shaped and has good bending strength. The steel can be regarded as a flat top rail. Due to wheel wear, it is generally only used for metallurgical cranes with small lifting weights and slow speeds, and the work is uncommon. The lateral displacement and height difference of the two rails are not greater than 1 mm. The order of rail welding joints is from bottom to top, first rail waist and head, then layer by layer, and then spot around. After welding the rail joints, set up a temporary fixture to fix the rails and make welding.

 

info-750-750

 

 

(3) The track spacing should be set according to the span size of the gantry crane. The longitudinal slope of the track is not allowed to exceed one percent. If it exceeds this value, the vehicle driving force and overall stability test will not meet the requirements of the track gradient correction. It can be put into use only after meeting this requirement.

 

(4) When welding, the wave soldering of each layer of the rail base should be used to weld the end of the welding electric, avoid contact welding and cutting arc, and the two layers before and after the wave soldering are opposite. Each rail welding operation should be carried out continuously. In order to keep the rail at high temperature welding.

 

(5) After the stress heat treatment after welding, it is not cooled down, but soaked in rain water; the hot plate can be removed from the cooling water, so it can be used next time. When the solder bump is too large, grind it with a grinder, and the locomotive is rinsed until the surface is polished.

 

 