Rail Fast Clip Technical Specification & Performance Data
| Parameter | Specification | Standards/Requirements | Testing Method |
|---|---|---|---|
| Product Type | Fast Clamping System | EN 13481-5, UIC 864-0 | Type Testing |
| Material Grade | High-Carbon Spring Steel | ASTM A689, EN 10089 | Material Certificate |
| Surface Treatment | Hot Dip Galvanized | ISO 1461 | Coating Thickness Gauge |
| Coating Thickness | 45-85μm | ISO 1461 | Magnetic Induction |
| Salt Spray Resistance | ≥500 hours white rust | ASTM B117 | Salt Spray Chamber |
| Hardness Range | 41-47 HRC | ISO 6508 | Rockwell Scale |
| Tensile Strength | ≥1600 MPa | ISO 6892-1 | Universal Testing Machine |
| Fatigue Performance | ≥3 million cycles @ 25kN | UIC 864-0 | Dynamic Fatigue Test |
| Clamping Force | 10-12 kN (initial) | EN 13481-5 | Hydraulic Press |
| Working Temperature | -40°C to +70°C | EN 13481-5 | Environmental Chamber |

Key Technical Advantages:
- Superior Elasticity
Returns to original shape after load removal
Maintains constant toe load
Absorbs dynamic energy effectively
- Corrosion Protection
Hot-dip galvanizing provides complete coverage
Suitable for all environmental conditions
Long-term corrosion protection
- Installation Efficiency
Average installation time: 8-12 seconds per clip
No torque measurement required
Minimal training needed
- Quality Assurance
Full traceability from raw material to finished product
Independent third-party certification available
Consistent batch-to-batch quality

gnee-professional supplier


Hot Tags: railway fastening fast rail clips, China railway fastening fast rail clips manufacturers, suppliers, factory, kpo rail clamp, railway track clips, railroad bolt, application rules of rail anchors, screw spikes in railway, Rail Insulator










